Services: MEP, Digital Engineering
Client: Ruddy Joinery
The conversion and refurbishment of the iconic Grade II Listed Building into a retail and residential development with floors from Basement 2, Basement 1, Ground and First to Fourth floor.
The Role of FHP
FHP was appointed to develop the MEP Stage 4a design of the bathrooms for ‘Off-Site’ fabrication of 118No. public bathrooms, showers, and baby-changing rooms for Ruddy Joinery.